 领顺为你介绍冷库的安装方案
1 地板安装 
先把地坪找平,后开始按装地板,挑选美观的地板放于显眼处,并做好地板及蒸发器排水系统。 
质量要求: 
地板安装平整,不平处用材料把地坪垫平,并锁紧板与板之间锁钩,达到库面平整,无空心感。(注意此排水系统如库体安装于北方室外则排水管需保温)。

2 立板安装 
根据场地情况先选一角,并定位(即立板与地板锁紧)以此角向两边延伸,只把立板与立板间锁紧,遇到立角处就定位,美观的板放于显眼处,安装到蒸发器那一面时,预先把排水管做好,库外需做 U 型弯及打硅胶。 
质量要求 :
立板显眼面平整,库板无凹点,立板上头面平齐,立板与立板间缝隙均匀,显眼处立角与地板角平齐。

3.天板安装 
先选定一头定位天角板和延伸铺设,天板与天板间锁紧,安装时显眼一头天板与立板在保证平整并锁紧,以防跑位。 
质量要求 :
显眼处天板选用美观天板,天与立板接缝处要平齐、缝隙小,库里面天板之间平整。
天、地、立板大体安装好后,天与立、立与地板之间修正平齐并锁紧,彼此间所有锁钩。
遇到需要锯的库板,锯口处需打磨,无毛刺,遇到需拉角铝的库板,则先硅胶,再拉角铝,保证密封性。
库体安装好后,排时间打硅胶,硅胶缝光洁、平滑,打硅胶最好排在当天收工时处理,以防碰坏。

4.设备安装

根据施工图及现场了解确定的情况,进行设备安装。

Linshun to introduce you to the installation of cold storage 1 floor installation, first leveling the floor, then began to press the installation of the floor, select a beautiful floor in a conspicuous place, and do a good job of floor and evaporator drainage system. Quality requirements: Floor installation level, uneven use of materials to level the floor pad, and locking plate and plate between the lock Hook, to level the warehouse surface, no hollow feeling. Note that this drainage system shall be insulated if the reservoir body is installed outside the north. 2 vertical plate installation, according to the site conditions first select a corner, and positioning (namely the floor and floor locking) to extend to both sides of this angle, only the vertical plate and the vertical plate locking, meet the corner position, beautiful plate placed in a conspicuous place, installed to the evaporator that side, the drainage pipe to do a good job in advance, outside the library to do U Bend and play Silica Gel. Quality Requirements: The prominent surface of the vertical plate is flat, there is no concave point on the warehouse plate, the head surface of the vertical plate is even, the gap between the vertical plate and the vertical plate is even, the prominent vertical angle is even with the floor angle. 3. For the installation of the ceiling, first select one end to locate the angle of the ceiling and extend the paving, the ceiling and the ceiling are locked, and when the installation is carried out, one end of the ceiling and the vertical board are kept flat and locked to prevent the running. Quality Requirements: eye-catching part of the ceiling to choose a beautiful ceiling, the sky and vertical joints to level off, small gaps, the library between the ceiling. The Sky, the ground, the vertical plate is installed, the sky and the vertical, the vertical and the floor between the correction level and lock, each other all lock hook. Meet the need to saw the library board, SAWS TO BE POLISHED, no Burr, meet the library board to pull angle aluminum, first Silica Gel, and then pull angle aluminum, to ensure sealing. After the installation of the library, row time to play Silica Gel, Silica Gel sewing smooth, smooth, Silica Gel best row at the end of the day to deal with, in case of damage. 4. Equipment installation according to the construction drawings and site to determine the situation, the installation of equipment.